Results

Key Civil & commercial projects

The HWC team can turn our hands to almost any civil or commercial work you need done, and done well. Here are just a few projects completed around Central Queensland.

Flender Workshop Upgrades

Medium-scale industrial construction

A recent project for Flender involved installing a 300-tonne capacity press pit while working around an active workshop floor. Our team successfully cut out, excavated and poured the shaft and floor system with zero disruption to ongoing manufacturing operations, demonstrating our ability to deliver complex industrial solutions in challenging environments.

Calvary Emerald Play Centre

Community facility extension and upgrade

Nominated for a 2021 Master Builders QLD ‘Community Service Facilities’ Award, this 400m2 playcentre included a café, party rooms, storage, 2x playgrounds, and external works. We used an innovative design that allowed for an architectural finish at a competitive price, completing the expansion while the client still used adjacent facilities.

Arcadia Valley Sports Court

Located 240km south of Emerald, this multipurpose basketball, volleyball, netball and tennis court is now a community hub. Such a remote job involved complex procurement, including special concrete blends, gravel trucked in from Emerald and a staggered build. As an active school for most of the build, we used some logistical creativity to complete works on time and in budget – including ‘borrowing’ a local’s John Deere machine to unload trucks, rather than getting our own equipment to site and back.

Denison State School

Amenities block construction

We re-designed and reconstructed the Amenities block at Denison State School to create a modern, fit for purpose facility. From removing existing concrete floors to re-aligning hydraulics and drainage, our team worked from the ground up to replace walls, lay a new epoxy floor and install privacy partitions, fittings and fixtures throughout. As a school, all work had to be undertaken in holiday periods to minimise disruption.

Bridgeman Park

Clubhouse design and construct

Winning the Central Highlands Regional Council tender process, we demolished the existing clubhouse and constructed the replacement 50% larger, on the same footprint. The major challenge was maintaining temporary amenities throughout construction in an active Capella sporting season – we worked around a rodeo, two campdrafts and the footy and cricket seasons. As principal contractors, we ensured uninterrupted community sport while delivering on time and to Council specifications.

Racing QLD

Central Highlands facility upgrades

This complex project involved designing and constructing 140 tie-up stalls, four wash bays, one veterinary stall, and two Judges’ Towers, with extensive concrete footings and full construction and electrical fit-out. HWC proposed innovative off-site fabrication to minimise disruption to daily racetrack operations, particularly around the training of valuable racehorses. All work was carefully scheduled around race meetings and daily training sessions, demonstrating our ability to deliver major infrastructure while respecting particularly sensitive operational requirements.

Central Highlands Regional Council

Thornton Street sewer upgrades

This technical civil project required precise timing to maintain waste flow for an entire suburb during construction. HWC successfully completed excavation to 5-metre depth, installed shoring, cut into the active sewer line, and installed manholes and jump-ups—all delivered, tested and commissioned within a critical one-hour window. Careful planning and programming ensured zero disruption to the community’s waste management during the complex underground infrastructure upgrade.

Munro Road

Road widening project

Part of AB Power’s warehouse development approval, this project required widening 280 lineal metres of road by 2 metres to accommodate road train access to the warehouse. HWC delivered new curb and channels, sub-grade preparation, asphalt surfacing, and crossovers while maintaining continuous vehicle access and providing traffic control throughout construction. The project was a great example of our capability to coordinate civil works with commercial development requirements under tight operational constraints.

Emerald Saleyards

Level crossing reconstruction

As Queensland Rail pre-qualified contractors, HWC executed a completely new rail level crossing, including culvert installation, access roads on both sides, a 300mm under-bore and sheath under the rail corridor, and rail corridor fencing. Despite a major rain event during construction, the project was completed on time, showing HWC’s ability to adapt to challenging weather conditions while maintaining correct safety standards for active rail infrastructure.